After a long period of survey, then designing and applying for permit, on June 27, 2023, SG CHEMICAL VINA project started to step into the steel structure erection phase. Therefore, the general contractor of SG Chemical Vina factory project, Kosia E&C Co., Ltd. held the safety ceremony to pray for the project, with the wishes that the project could go smoothly, peacefully and well.
The ceremony is attended with the General Director, Mr. An Chang Deok, and Director Choi Yu Jun, and the board of directors of the investor, the general director, Mr. Lee Ki Hwa, the board of directors, all technical staff and employees of the general contractor, Kosia E&C Co., Ltd., and also the precious presence of other investors.
SG CHEMICAL VINA factory project is built at Lot 33, Road No. 04, Chau Duc Industrial Park, Chau Duc District, Ba Ria Vung Tau. The factory is built on a land area of 22,286.60 m2, to produce and process surface protection stickers, with a total project investment of more than 4.5 million USD, divided into two phases. Construction period 01 is 06 months, the factory is expected to be put into use in September 2023.
The General Contractor’s representative thanked the investors for always trusting, supporting and creating the most favorable conditions for the general contractor in the process of the survey, designing and applying for permit smoothly. Besides, the contractor appreciates the management board of BRVT and Sonadezi industrial zones to help and create good conditions for The Contractor in the paperwork process of licensing the project.
The ceremony was solemn and successful.